Aalter-Beernem, L50A Ghent-Bruges level crossings

Aalter-Beernem, L50A Ghent-Bruges level crossings

This contract involves the civil engineering, roads and environment works, hydraulics and earthworks for the removal of five level crossings (OW36, OW37, OW39, OW42 and OW45) and the replacement of these with a bridge, cyclist and pedestrian tunnels.

Tunnel placement 13-14 February 2016

Tunnel placement 19-20 March 2016

  • Type
    Civil engineering, roads and environment works
  • Builder
    Tuc Rail
  • Client
    Infrabel
  • Project manager
    BAM Contractors
  • Commencement of work
    2015
  • End of work
    2016