Hasselt, carpool car park

Hasselt, carpool car park

This project involved

  • construction of a carpool car park at Hasselt-Zuid
  • construction of an access road between the carpool car park and Biezenstraat
  • construction of a tunnel and access slopes at the slip roads complex 28 of the E313 at Hasselt
  • reconstruction/elevation of the open exit road from the motorway
  • construction of buffer basins and drainage

The carpool car park was constructed in porous paving.

For the building of the art work, measures were taken to reduce traffic disruption to a minimum. This required a special building technique whereby the tunnel and all the associated earthworks and roadworks took place in only one weekend.

  • Location
    Hasselt-Zuid Biezenstraat
  • Builder
    Vlaamse Overheid
  • Client
    Agentschap Wegen en Verkeer Limburg
  • Project manager
    BAM Contractors (Betonac)
  • Commencement of work
    2010
  • End of work
    2011