Platform renovation Area North East

Location
Alken, Sint-Truiden en Kiewit
Client
TUC RAIL nv
Start of the construction
08/2018
End of the construction
10/2021

Platform renovation Area North East

Raising, equipping and modernising platforms at various stops - Area North East - Part Alken, Sint-Truiden and Kiewit

The works within this contract mainly consist of:

  • Detailed study per stop, using the building blocks included in the specifications;
  • Breaking out and removing low or medium platform edges and replacing them with raised platform edges;
  • Removal of current platform furniture;
  • Breaking out of flooring and barriers;
  • Locating and temporarily protecting cables;
  • Earthmoving;
  • (Re)installation of monitoring wells;
  • Construction of waiting tubes, pipes and cables;
  • Flooring works;
  • Drainage works;
  • Installation of platform furniture: shelters, benches, timetable signs, etc.
  • Installation of platform installations: lighting, sound system, electrical installation, barriers, etc.