Platform renovation Area North East
Location
Alken, Sint-Truiden en Kiewit
Client
TUC RAIL nv
Start of the construction
08/2018
End of the construction
10/2021
Platform renovation Area North East
Raising, equipping and modernising platforms at various stops - Area North East - Part Alken, Sint-Truiden and Kiewit
The works within this contract mainly consist of:
- Detailed study per stop, using the building blocks included in the specifications;
- Breaking out and removing low or medium platform edges and replacing them with raised platform edges;
- Removal of current platform furniture;
- Breaking out of flooring and barriers;
- Locating and temporarily protecting cables;
- Earthmoving;
- (Re)installation of monitoring wells;
- Construction of waiting tubes, pipes and cables;
- Flooring works;
- Drainage works;
- Installation of platform furniture: shelters, benches, timetable signs, etc.
- Installation of platform installations: lighting, sound system, electrical installation, barriers, etc.