Location
Brussels ring (RO) at the level of Vlasmarktdreef
Client
Flemish Government, Agency for Roads and Traffic Flemish Brabant
Start of the construction
05/2023
End of the construction
06/2024

ECODUCT HALLE

The existing concrete bridge will be demolished and a new ecoduct will be built over the Brussels Ring R0 near the Hallerbos in Halle, replacing the existing road bridge on the Vlasmarktdreef. The new bridge will consist of two separate portico bridges at the location of the demolished bridge.